NEWS
To strengthen its presence on the Asian market Siemens AL has partnered with evopro to provide their services for the expansion of the third passenger terminal at Beijing International Airport.
To strengthen its presence on the Asian market Siemens AL has partnered with evopro to provide their services for the expansion of the third passenger terminal at Beijing International Airport.
The baggage transport system that is currently under construction for a cost of 250 million USD is projected to serve 66 million travelers by 2015.
The task of the engineers at evopro is to integrate the security X-Ray machines from various manufacturers into the baggage transport system.
The desire to increase capacity at the airport first came up 3 years ago. The premiere of the 4.6 billion USD Terminal 3 will be the 2008 Beijing Olympics. The maximum capacity of the system is 19000 pieces of baggage per hour – this capacity is large enough to handle the full load of 66 Airbus A380 Superjumbos simultaneously.